— SOLUTION
Integrated Rack Solutions
Pre-configured, production-ready racks built to your specification in our facilities and shipped to any global destination. We handle the entire integration process from component sourcing to final packaging so your team unpacks, plugs in, and powers on.
Book a consultation
Overview

Component sourcing across major OEMs and ODMs
Mechanical assembly to customer specification
Structured cabling with documented run sheets
Asset tagging, labeling, and configuration tracking
Burn-in testing under simulated production load
Firmware staging and image deployment
Custom packaging for global transit
Pre-shipment quality assurance and photo documentation
How It Works
Step 1
Scope and design
We work with your engineering team to capture the rack design, bill of materials, cabling standards, labeling conventions, and acceptance criteria.
Step 2
Procurement and integration
Components are sourced through our multi-vendor network, delivered to one of our integration facilities, and assembled by our engineering team following your specifications.
Step 3
Testing and validation
Every rack runs burn-in testing under load. We capture configuration baselines, validate cabling integrity, and document the build with photos and run sheets.
Step 4
Global shipment
Racks ship in custom-engineered packaging built for international transit, coordinated with our IOR and logistics services for delivery to any country in our coverage network.
Deployment timelines compressed by weeks compared to on-site integration
Configuration consistency across hundreds or thousands of racks
Reduced onsite labor and lower risk of installation errors
Documented chain of custody and configuration baselines

Use Cases
Hyperscaler regional buildouts
Concurrent rack integration in our facilities while site preparation completes in-region, enabling launch-ready deployment on day one of facility handoff.
Enterprise AI infrastructure
GPU rack integration with liquid cooling readiness, power validation, and pre-staged AI software stacks tested before shipment.
Edge deployments
Standardized rack builds shipped to dozens of edge locations with consistent configuration and minimal in-country technical labor required.
Send us your rack design or current bill of materials. We will come back with a scoped integration proposal within 48 hours.
Talk to a Rack Integration Expert
— Related solutions

